![]() Discovery’s next flight, the second mission to service the Hubble Space Telescope, is targeted for launch in early 1997. Discovery is scheduled to depart KSC via the 747 Shuttle Carrier Aircraft (SCA) on Tuesday, Sept. But to cut costly work - time inside the. During this time, the vehicle will be outfitted with a 5th set of cryogenic tanks and an external airlock to support missions to the international Space Station. According to customary procedures, one was sent to Kennedy's Orbiter Processing Facility for installation. Discovery arrived at KSC atop a 747 space shuttle carrier aircraft Sunday after a cross country trip from Edwards Air Force base in California. NOTE: Discovery is scheduled to be delivered to Palmdale, Calif., for a nine-month Orbiter Maintenance Down Period (OMDP). Télécharger cette image : Workers are dwarfed as space shuttle Discovery is towed from the mate-demate device to the orbiter processing facility at Kennedy Space Center in Cape Canaveral, Fla. LOCATION: Orbiter Processing Facility bay 1ĭATE OF DEPARTURE FOR PALMDALE, CALIF.: Sept. The payload bay doors will be open tomorrow and the payloads removed on Saturday.ĭISCOVERY/OV-103 - Pre-Orbiter Maintenance Down Period Jack and leveling operations are complete and work has begun to drain the residual cryogenic reactants from the orbiter’s onboard fuel cell supply tanks. NOTE: Post-mission servicing of Endeavour following Monday’s landing at KSC continues in OPF bay 3. ORBITAL ALTITUDE and INCLINATION: 184 statute miles/28.45 degrees MISSION DURATION: 8 days, 22 hours, 11 minutes LOCATION: Orbiter Processing Facility bay 3 MISSION: STS-72 - SFU-Retrieval & OAST-Flyer Die erste Landung einer US-Raumfähre auf der SLF fand am 11. Der Platz war ursprünglich von der NASA für Landungen des Space Shuttle gebaut worden. * Roll to Vehicle Assembly Building (Oct. Die Launch and Landing Facility ( LLF, vormals Shuttle Landing Facility, SLF) ist ein von Space Florida betriebener Flugplatz auf dem Kennedy Space Center. * Docking module interface verification test (Wednesday/Thursday) ORBITAL ALTITUDE and INCLINATION: 196-245 statute miles/51.6 degrees LOCATION: Orbiter Processing Facility bay 2 MISSION: STS-74 - 2nd MIR DOCKING (Docking Module) ![]() * Functional check-out of contingency spacesuits (Thursday) KEY OPERATIONAL MILESTONES (dates are target only): ORBITAL ALTITUDE and INCLINATION: 172 statute miles/39 degrees MISSION DURATION: 15 days, 21 hours, 55 minutes
0 Comments
Leave a Reply. |